Bristol continues to build on its ambition to be carbon neutral by 2030 with a highly sustainable development of 50 affordable homes featuring individual ‘Shoebox’ ground source heat pumps connected to an ambient shared ground loop array, supplied by Kensa Heat Pumps and installed by Kensa Contracting.
The Shaldon Road scheme is being delivered by national contractor United Living in partnership with United Communities and the Bristol Community Land Trust, with the support of Bristol City Council and Homes England. The scheme will integrate community development with high levels of energy efficiency and environmental enhancements.
Built to ‘PassiveHaus’ principles, the energy efficient properties will provide owners with a high level of tenant comfort while using very little energy for heating and cooling, minimising each home’s carbon footprint. The development will include two, three, and four bedrooms houses with a mixed tenancy of shared equity and affordable rent.
Constructed using a single skin ‘Porotherm‘ block which will deliver improved thermal properties over traditional construction and encase the most efficient of internal renewable heat technologies within.
Kensa’s ‘Shoebox’ ground source heat pumps will be installed into each individual dwelling delivering an exceptionally efficient, low-cost and low-carbon heating and hot water system; complemented by a mechanical vented heat recovery system (MVHR) which will further increase the homes energy efficiency and further decrease fuel bills for residents.
Solar PV panels will also feature in the development further reducing costs and supporting a green transport plan which includes electric car charging points, a car share scheme and improved pedestrian and cycle access.
Communal green space around the homes is also being created with a dedicated and protected green corridor for biodiversity and wildlife including bats, birds, bees and other insects.
In addition to the development’s ultra-green credentials, Shaldon Road is adopting a ‘self-finish’ approach, one of the biggest of its kind ever undertaken in Bristol.
The ‘self-finish’ model will see future residents getting involved in making design decisions which will enable them to tailor their new homes interior. Encouraging owners to undertake physical works on their properties to include second fix carpentry, fitting kitchens and decorating aimed at making the properties even more affordable. Coupled with the lower energy costs associated with the ‘PassivHaus’ design principles and renewable technologies, the project hopes to set a new standard for a truly sustainable community development.
Caroline Lewis, New Business Manager at United Living, said:
The start of this project represents the culmination of a lot of hard work and dedication from the whole project team. United Living are very proud to be involved in this project as it embodies all of our core value, especially our commitment to creating communities not just building homes. We are acutely aware of the need to develop and implement solutions to tackle the housing shortage and climate change, at United Living we are constantly working with our partners to deploy innovative ways to address these issues, the solutions we are using at Shaldon Road are a small part of this.
Anna Klimczak, Interim CEO at United Communities, said:
We are thrilled that work has started on this site. The Shaldon Road scheme will bring much needed new homes to the Lockleaze area and transform the lives of the incoming residents, many of whom are from the local community. The scheme has empowered residents to make decisions about their new homes many of whom have been involved from the start. Residents will also be gaining valuable practical skills through the self-finish model. Communities are at the heart of what we do at United Communities; 30% of our new homes will be community-led projects by 2024. We look forward to the scheme progressing and the residents enjoying their new homes.
Lindy Morgan, CEO at Bristol Community Land Trust, said:
I am thrilled that this pioneering scheme has now started on site. It has been an immense learning curve for the Bristol CLT board and staff, and even more so for the future residents, some of whom have been involved for a number of years. The passion of all those involved has driven the project forward, and we cannot wait to see it coming out of the ground. The scheme will deliver life-changing opportunities to those who have been matched with a home at the scheme and has always had community at the heart of it.
George Gillow, Business Development Manager, Kensa Contracting:
It is a pleasure to be involved in the development of high quality, energy efficient housing, specifically built for local families, whilst also helping Bristol to reduce their CO2 emissions and improve local air quality with British-made ground source heat pumps.